Protect critical  infrastructure projects with confidence


Building cities safer, smarter, faster.

With so much at stake, it’s not surprising that the demands for efficiency, transparency and fairness in infrastructure projects are so high.

Complex, high value procurement processes are among the most difficult and high-risk activities you will undertake.

Risk

$

Understanding the challenges
of powering progress

There is a huge amount of infrastructure to be built or updated globally.

With the massive amount of taxpayer money forecast to be spent and unprecedented scrutiny from the press and the public, these high-value, high profile projects require careful management. A well-run process reduces risk, ensures fairness, improves efficiency and keeps bidder engagement and interaction high.

Tracking

Font
Green, Azure, Rectangle, Font, Aqua

Tracking

Tracking of all activity for probity/audit purposes.

Management

Material property, Rectangle, Font
Green, Rectangle, Font

Management

Secure and efficient management of bidder submissions and workflows.

Anonymity

Font
Rectangle, Font

Anonymity

Anonymity
of bid teams.

Two-way Q&A

Material property, Rectangle

Two-way Q&A

A two-way RFI/Q&A process that is efficient, controlled and fully trackable.

Access

Font

Access

Staged, equal access for bidders to tender information.

Security

Font
Rectangle, Font

Security

Full lifecycle security for documents shared with the project teams and bidders.

These and other requirements are non-negotiable.

These critical processes are currently run across disparate systems, all with little project-specific technical support.

SharePoint

Font

printed documents

Material property, Font

USB/hard drives

Font

project management tools

Eye, Sleeve, Font

M&A-focused
data rooms

Font

generalised
e-procurement systems

Font

email

Font

project management tools

Eye, Sleeve, Font

M&A-focused
data rooms

Font

email

Font

SharePoint

Font

printed documents

Material property, Font

USB/hard drives

Font

generalised
e-procurement systems

Font

Possible outcomes of critical failure you need
to avoid

Road surface, Urban design, Infrastructure, Asphalt, Thoroughfare, Car

The winning bid doesn’t provide the best end result possible

Road surface, Daytime, Infrastructure, Thoroughfare, Tree, Plant, Bridge, Landscape

Loss of government reputation

Personal computer, Laptop, Table

Loss of project team members' reputations

Mode of transport, Flash photography, Escalator, Standing, Stairs

Loss of taxpayers’ money

So how can governments and advisors navigate risk?

By identifying the knowledge gaps.

Your team is accepting a much higher level of risk by using disparate, not fit for purpose systems. While together these systems may meet the minimum requirements of these complex processes, they reduce efficiency and greatly increase the risk of human error.

Facial expression, Street fashion, Flash photography, Smile, Lip, Hairstyle, Shoulder, Eyebrow, Sleeve, Happy

Expert team

They also should have a team of experts available at any point to ensure that the systems are used the right way, all the way throughout the tender process.

Expert team

They also should have a team of experts available at any point to ensure that the systems are used the right way, all the way throughout the tender process.

One place

Your team should be reducing the risk of process failure, and increasing efficiency and bidder engagement, by managing the process in one highly controlled, secure and auditable place.

One place

Your team should be reducing the risk of process failure, and increasing efficiency and bidder engagement, by managing the process in one highly controlled, secure and auditable place.

What does best-practice look like?

So how can your team get the confidence that an infrastructure project will be managed successfully?


Choosing the right technology to run this critical process is a great place to start.

Ansarada is an industry-leading solution catered to complex tendering and procurement, with a unique feature set that facilitates all stages of the process, from gateway review to contract award.

Ansarada is the only platform provider that can do all of this in a single, secure audited system and provides expert assistance to ensure global best practice methods are used.

Operating system, Computer, Rectangle, Font, Screenshot

“We use systems like Ansarada where it’s all controlled and managed. Once it’s set up and it’s operating, you can’t send the wrong information to the wrong person.”

John McLuckie, Valorem Advisory

Vision care, Glasses, Smile, Eyewear, Sleeve

We have an extensive track record  on some of the world’s largest  infrastructure projects.

Flash photography, Water, Architecture, Style, Sky, Black-and-white

|  Etihad Rail (UAE) – all stages

|  Etihad Rail (UAE) – all stages

|  Greater Washington Tollroads ( USA)

|  Ofgem (UK Gov)

|  Gauteng (Gauteng Provincial Gov, South Africa)

|  Westconnex (NSW Gov) – all stages

|  Sydney Metro (NSW Gov) – all stages

|  North East Link Project (VIC Gov)

|  Melbourne Metro Rail Tunnel (Vic Gov)

|  Western Sydney Airport (NSW Gov)

|  Health Partnerships (NSW Gov)

|  Western Harbour Tunnel and Beaches Link (NSW Gov)

|  Social Housing Management Transfer Program
  (NSW Gov)

$25b

+5b

$25b

10b GBP

10b ZAR

$20b

$30b

$16b

$11b

$7b

$5b

$4b

$1b

Building Sydney

Explore major projects by clicking their locations.

Port Botany
Electricity Networks Transaction
WestConnex
WestConnex
WestConnex
Sydney Metro North West
Sydney Metro North West
Sydney Metro City & South West
Sydney Metro City & South West
Sydney Metro City & South West
Sydney Metro City & South West
Sydney Metro West
Sydney Metro West
Port Botany Rail Duplication Project
Parramatta Light Rail
Parramatta Light Rail
Parramatta Light Rail
Parramatta Light Rail
Parramatta Light Rail
Sydney Light Rail
Sydney Light Rail
Sydney Light Rail
Sydney Light Rail
Sydney Light Rail
Sydney Light Rail
More Trains More Services
Cabramatta Loop Project
Ferries Procurement
Beaches Link
Warringah Freeway Upgrade
M6 (Arncliffe to Rockdale)
M12 to Sydney Airport
Sydney Gateway
Heathcote Road Bridge Widening Project
Western Sydney Airport Line
John Maroney Correctional Facility
Northern Beaches Hospital
Central Precinct Renewal
Circular Quay Renewal
Kirkbridge Precinct Project
Sydney Stadium
Land and Housing Corporation
European Train Control System (ETCS)
Olympic Park Redevelopment
New Powerhouse Museum
Warragamba Dam Raising
Sydney Bus Services
Sydney Modern Project

Warragamba Dam Raising

DATE
28/06/2017 – 15/01/2019

PROJECT VALUE (AUD)
$700 million

SECTOR
Utilities

Water resources, Sky, Lake, Watercourse, Bank

Sydney Modern Project

DATE
22/08/2018 - 09/09/2019

PROJECT VALUE (AUD)
$344 million

SECTOR
Urban Renewal

Urban design, Tower block, Sky, Daytime, Building, Skyscraper, Plant

New Powerhouse Museum

DATE
24/11/2020 – Ongoing

PROJECT VALUE (AUD)
$950 million

SECTOR
Urban Renewal

Water, Sky, Building, Plant, Skyscraper, Daytime, Property, Bird, Cloud, Tree

Olympic Park Redevelopment

DATE
19/06/2019 – 22/09/2020

PROJECT VALUE (AUD)
$810 million

SECTOR
Urban Renewal

Urban design, Tower block, World, Sky, Building, Architecture, Cityscape

Sydney Bus Services

DATE
17/09/2012 – 16/03/2013

PROJECT VALUE (AUD)
$3,600 million

SECTOR
Public Transport

Vehicle registration plate, Wheel, Tire, Bus, Building, Window, Infrastructure

European Train Control System (ETCS)

PROJECT VALUE (AUD)
$800 million

SECTOR
Public Transport

Track, Line, Rectangle, Railway

Land and Housing Corporation

DATE
15/06/2020 – Ongoing

SECTOR
Urban Renewal

Tower block, Urban design, Sky, Building, Plant, Window, Tree, Rectangle, Cloud, Condominium

Sydney Stadium

DATE
19/07/2016 – 24/07/2020

PROJECT VALUE (AUD)
$828 million

SECTOR
Urban Renewal

Field house, World, Light, Black, Sky, Lighting, Fan, Floodlight, Line

Kirkbridge Precinct Project

DATE
22/02/2020 – 21/02/2021

SECTOR
Urban Renewal

Circular Quay Renewal

DATE
20/03/2018 – Ongoing

PROJECT VALUE (AUD)
$200 million

SECTOR
Urban Renewal

Central Precinct Renewal

DATE
04/08/2017 – 31/08/2020

PROJECT VALUE (AUD)
$2,500 million

SECTOR
Urban Renewal

Urban design, Public space, Plant, Lighting, Building, Wood, Line, Sky, Tree

Northern Beaches Hospital

START DATE
7/11/2013

PROJECT VALUE (AUD)
$2,140 million

SECTOR
Health

Street light, Urban design, Tower block, Sky, Building, Plant, Condominium

John Maroney Correctional Facility

SECTOR
Justice

Western Sydney Airport Line

PROJECT VALUE (AUD)
$11,000 million

SECTOR
Public Transport

Heathcote Road Bridge Widening Project

DATE
22/06/2021 – Ongoing

PROJECT VALUE (AUD)
$115 million

SECTOR
Roads

Sydney Gateway

DATE
1/11/2017 – Ongoing

PROJECT VALUE (AUD)
$2,600 million

SECTOR
Roads

Transport hub, Road surface, Urban design, Residential area, Daytime, Property, Building, Infrastructure, Neighbourhood, Thoroughfare

M12 (to Sydney Airport)

DATE
28/05/2021 – Ongoing

PROJECT VALUE (AUD)
$2,000 million

Sector
Roads

Road surface, Urban design, Sky, Cloud, Infrastructure, Tree, Car, Asphalt, Architecture, Thoroughfare

M6 (Arncliffe – Rockdale)

DATE
24/08/2017 – Ongoing

PROJECT VALUE (AUD)
$2,600 million

SECTOR
Roads

Warringah Freeway Upgrade

DATE
14/01/2020 – Ongoing

PROJECT VALUE (AUD)
$1,180 million

SECTOR
Roads

Western Harbour Tunnel/Beaches Link

DATE
17/02/2017 – Ongoing

PROJECT VALUE (AUD)
$14,000 million

SECTOR
Roads

Ferries Procurement

DATE
14/08/2018 – 12/03/2019

PROJECT VALUE (AUD)
$1,300 million

SECTOR
Public Transport

Cabramatta Loop Project

DATE
04/05/2020 – 31/07/2021

PROJECT VALUE (AUD)
$400 million

SECTOR
Public Transport

More Trains More Services

DATE
27/06/2018 – Ongoing

PROJECT VALUE (AUD)
$3,100 million

SECTOR
Public Transport

Sydney light rail (Dulwich Hill)

DATE
19/11/2013 – 10/03/2015

PROJECT VALUE (AUD)
$3,150 million

SECTOR
Public Transport

Mode of transport, Motor vehicle, Rolling stock, Street light, Train, Building, Infrastructure, Electricity, Tree

Sydney light rail
(Central Chalmers)

DATE
19/11/2013 – 10/03/2015

PROJECT VALUE (AUD)
$3,150 million

SECTOR
Public Transport

Sydney light rail

DATE
19/11/2013 – 10/03/2015

PROJECT VALUE (AUD)
$3,150 million

SECTOR
Public Transport

Rolling stock, Motor vehicle, Train, Window, Electricity, Railway, Fixture, Track

Sydney Light Rail

DATE
19/11/2013 – 10/03/2015

PROJECT VALUE (AUD)
$3,150 million

SECTOR
Public Transport

Land vehicle, Rolling stock, Automotive lighting, Train, Daytime, Infrastructure, Building, Electricity

Sydney light rail

DATE
19/11/2013 – 10/03/2015

PROJECT VALUE (AUD)
$3,150 million

SECTOR
Public Transport

Mode of transport, Automotive lighting, Rolling stock, Train, Window, Vehicle, Building, Track, Tree, Electricity

Sydney light rail

DATE
19/11/2013 – 10/03/2015

PROJECT VALUE (AUD)
$3,150 million

SECTOR
Public Transport

Mode of transport, Rolling stock, Train, Building, Daytime, Vehicle, Electricity, Window, Tree, Thoroughfare

Parramatta Light Rail (Carlingford)

DATE
30/06/2017 – 11/04/2019

PROJECT VALUE (AUD)
$2,500 million

SECTOR
Public Transport

Parramatta Light Rail (Camellia)

DATE
30/06/2017 – 11/04/2019

PROJECT VALUE (AUD)
$2,500 million

SECTOR
Public Transport

Parramatta Light Rail (Parramatta Square)

DATE
30/06/2017 – 11/04/2019

PROJECT VALUE (AUD)
$2,500 million

SECTOR
Public Transport

Mode of transport, Rolling stock, Building, Train, Vehicle, Sky, Thoroughfare, Electricity, Travel

Parramatta Light Rail (Factory Street)

DATE
30/06/2017 – 11/04/2019

PROJECT VALUE (AUD)
$2,500 million

SECTOR
Public Transport

Parramatta Light Rail (Westmead)

DATE
30/06/2017 – 11/04/2019

PROJECT VALUE (AUD)
$2,500 million

SECTOR
Public Transport

Port Botany Rail Duplication Project

DATE
04/05/2020 – 31/07/2021

PROJECT VALUE (AUD)
$400 million

SECTOR
Public Transport

Mode of transport, Motor vehicle, Rolling stock, Urban design, Infrastructure, Track, Building, Plant

Sydney Metro West

PROJECT VALUE (AUD)
$7,200 million

SECTOR
Public Transport

Sydney Metro West

PROJECT VALUE (AUD)
$7,200 million

SECTOR
Public Transport

Transport hub, Cloud, Sky, Building, Train, Vehicle, Shade, Rolling, Railway

Sydney Metro City & South West (Bankstown)

PROJECT VALUE (AUD)
$12,500 million

SECTOR
Public Transport

Sky, Travel, Shade

Sydney Metro City & South West (Hunter St)

PROJECT VALUE (AUD)
$12,500 million

SECTOR
Public Transport

Hard hat, High-visibility clothing, Smile, Outerwear, Helmet, Workwear, Infrastructure, Engineer, Asphalt, Tradesman

Sydney Metro City & South West (Sydney)

PROJECT VALUE (AUD)
$12,500 million

SECTOR
Public Transport

Sydney Metro
City & South West (Parramatta)

PROJECT VALUE (AUD)
$12,500 million

SECTOR
Public Transport

Sydney Metro North West (Chatswood Station)

DATE
Completed

PROJECT VALUE (AUD)
$7,300 million

SECTOR
Public Transport

Sydney Metro North West (Tallawong)

DATE
Completed

PROJECT VALUE (AUD)
$7,300 million

SECTOR
Public Transport

WestConnex
(S Western Motorway)

DATE
17/10/2013 – Ongoing

PROJECT VALUE (AUD)
$16,800 million

SECTOR
Roads

WestConnex
(M4-M5 Rozelle interchange)

DATE
17/10/2013 – Ongoing

PROJECT VALUE (AUD)
$16,800 million

SECTOR
Roads

Street light, Automotive lighting, Road surface, Sky, Building, Infrastructure, Asphalt

WestConnex
(A44 & Woodwille Rd)

DATE
17/10/2013 – Ongoing

PROJECT VALUE (AUD)
$16,800 million

SECTOR
Roads

Mode of transport, Road surface, Urban design, Residential area, Asphalt, Infrastructure, Thoroughfare, Cityscape, Landscape

Electricity Networks Transaction

DATE
14/05/2015 – 20/01/2019

PROJECT VALUE (AUD)
$10,300 million

SECTOR
Utilities

Overhead power line, Transmission tower, Sky, Nature, Electricity

Port Botany & Kembla

PROJECT VALUE
$5,070 million

SECTOR
Ports

Sky, Cloud, Plant, Building

Ansarada enables project teams to improve the management of high value, high profile and highly complex tendering and procurement processes. The technology has been designed in partnership with government project teams and advisors leading some of the largest projects in the world.

Operating system, Rectangle, Font

Fill in the form to view our full lifecycle tender management solution.

Embedded code will run in preview and on published site

If you want more coding flexibility, we recommend using a coded element created in the Code Editor.

THANK YOU!

Rectangle
Green